error : cannot receive stock quote information

NASA Reschedules Shuttle Launch Status Meeting, Discovery’s Launch No Earlier Than Dec. 3

On Launch Pad 39A at NASA's Kennedy Space Center in Florida, technicians reattach the vent line to the ground umbilical carrier plate, or GUCP, on space shuttle Discovery's external fuel tank.

Photo by Ben Smegelsky/NASA

HOUSTON — NASA managers have postponed a launch status meeting and news conference planned for Monday, Nov. 22. The events were rescheduled after a Space Shuttle Program meeting Thursday determined more analysis is needed before proceeding toward the launch of space shuttle Discovery on its STS-133 mission.

The Program Requirements Control Board (PRCB) identified the analysis and repairs required to safely launch Discovery. This analysis will be done during the next five days and reviewed at a special PRCB on Wednesday, Nov. 24. Pending a successful review of the flight rationale at that meeting, a launch status briefing will be held with senior NASA managers on Monday, Nov. 29.

Work has been under way to fix a leaking hydrogen system that caused the initial delay, and to repair cracks atop two 21-foot-long support beams, called stringers, on the exterior of the shuttle’s external fuel tank.

The Kennedy Space Center will begin the launch countdown no earlier than Nov. 30. That would support a launch attempt for Discovery no earlier than Dec. 3 at approximately 2:52 a.m. EST.

For STS-133 crew and mission information, visit:

http://www.nasa.gov/shuttle

Short URL: http://www.beacon-news.com/?p=2320

Posted by on Nov 19 2010. Filed under Space. You can follow any responses to this entry through the RSS 2.0. Both comments and pings are currently closed.

Comments are closed

Featured Links

    Search Archive

    Search by Date
    Search by Category
    Search with Google

    Photo Gallery

    Log in | Designed by Gabfire themes